RSS

Category Archives: Green world

How to equalize deep cycle batteries


​Recharging deep-cycle batteries with a charger using a constant voltage or a fixed charge algorithm can, over time, lead to a condition called stratification. Stratification occurs when the acid in the electrolyte separates from the water and settles to the bottom of the battery causing damage to the bottom area of the battery plates.

To prevent stratification, it’s important to regularly perform an equalizing procedure to your batteries.   Equalizing adds an extended charge at the end of the normal charging process necessary to  promote gassing of the electrolyte in order to “re-mix” the acid and water.
THE EQUALIZING PROCESS

The method used to properly equalize batteries is as easy as using a high-quality battery charger that features an automatic equalizing mode, or has the capability to extend or restart the charging process as needed. Follow these procedures to properly equalize charge your batteries.

    Make Sure The Battery Is A Flooded Lead-Acid Type.

    All Electrical Loads To The Battery Must Be Removed.

    Connect Your Charger And Charge The Batteries Until The Charger Terminates A Normal Charge Cycle.

a.) If the charger is equipped with an automatic equalizing mode, make sure the charger is connected and powered up long enough to complete equalization.

b.) If the charger is not equipped with an automatic equalization mode, assure the charger completes a full, automatic charge, and then restart the charger by disconnecting AC power and reconnecting.  The charger should restart and extend the charge time by 1-3 hours

4.   Correct Equalizing Will Cause Gassing And Bubbling Of The Electrolyte.

5.   Take Specific Gravity Readings Every Hour.

6.   You Will Know That The Equalization Process Is Complete: When the specific gravity values no longer increase during the gassing stage.  If the charger terminates the charge automatically, before the hourly specific gravity readings are constant, restart the charger and continue the process until specific gravity readings are constant.

7.  Make Sure To Replace Any Water Lost During The Process.

Equalizing your deep-cycle batteries is a great way to extend battery life and lower operational costs over time. It will also help to remove a buildup of lead sulfate crystals on the battery’s plates, a condition called sulfation. This condition lowers the battery’s ability to take a full-charge and diminishes its full power. Equalizing is just one of several procedures you should be adding to your maintenance schedule every time you service the batteries.  This regular service, including watering, should be performed at least once a month, or more frequently during periods of heavy use.

Advertisements
 

Homemade Laundry Detergent


http://m.instructables.com/id/Homemade-Laundry-Detergent/?ALLSTEPS

 
Leave a comment

Posted by on May 18, 2016 in Green world, Ideas, Job, Startup, technology, Tips

 

How solar panel specs are defined: 240 Watt Solar Panel


http://pointzeroenergy.com/product/240-watt-solar-panel/

Electrical Data
Nominal peak power(Pmax) 240Wp
Maximum power voltage(Vmp) 30.65V
Maximum power current(Imp) 7.83A
Short-circuit current(Isc) 8.36A
Open circuit voltage(Voc) 37.8V
Optimized cell efficiency(η) 17.00%
Limits
Operating temperature -40℃ to +85℃
Maximum system voltage
(IEC/UL standard) 1000VDC/600VDC
Additional Data

Number of cells and type of connection 60,serial connection
Dimensions Length:1640mm
Width:992mm
Height:46mm
Net weight 20kgs/pc
Gross weight 475kgs/ctn(22pcs/ctn) 44kgs/ctn(2pcs/ctn)
1047lbs/ctn(22pcs/ctn)  97lbs/ctn(2pcs/ctn)
Package dimension 1695x1120x1140mm 1658x1022x110mm
67”x45”x45”      66”x41”x4”

Guaranteed Power Output 15 year: 90% of its nominal power rating;  25 year: 80% of its nominal power rating
Impact Resistance Can bear the force that is generated by one 227g steel ball falling down from 1m height
Warranty period 10 years:Materials and workmanship defects
Certificates UL1703/CSA, CEC.
Cells Polycrystalline silicon photovoltaic cell

 

Big thank you to all my friends ☺☺☺☺☺


The WordPress.com stats helper monkeys prepared a 2015 annual report for this blog.

Here’s an excerpt:

A New York City subway train holds 1,200 people. This blog was viewed about 4,000 times in 2015. If it were a NYC subway train, it would take about 3 trips to carry that many people.

Click here to see the complete report.

 

World’s Smallest Power Supply !


http://www.instructables.com/id/Worlds-Smallest-Power-Supply-/?ALLSTEPS

 
Leave a comment

Posted by on December 25, 2015 in Arduino, Green world, Startup, technology

 
Image

Light dependent bulb


image

 
Leave a comment

Posted by on December 17, 2015 in Green world, technology

 

Build A 70 Amp Arc Welder


http://miscdotgeek.com/build-a-70-amp-arc-welder/

 
Leave a comment

Posted by on September 28, 2015 in Green world, Ideas, technology, Tips

 
 
%d bloggers like this: